Dear Experts,
We have the below requirement.
1) Receive goods into an IM location and perform inspection.
2) After inspection, the goods are transferred to EWM.
3) "01" inspection is active and inspection is method chosen in EWM is based on material master and not rule.
4) System creates an inspection lot also for the transfer delivery (DIG) during GR ?
How can we avoid this ?
Request clarification before answering.
Hi,
try to implement Badi /SCWM/EX_QM_INSP_RELEVANCE, with output cv_not_relevant = ABAP_TRUE.
Regards
Martin