on 2025 Mar 14 11:53 AM
Hello!
Do you know how to set a rounding rule or someting for picking that makes the system to generate a warehouse task for moving the full bag or the full handling unit to the PSA and not just the quantity required for the production order?
Example: An ingredient is stored in bags of 5kg. The recipe to be made requires 7 kg of that ingredient, which is the quantity required from production/the factory. The warehouse has to take two bags to the production supply area so the production people manage whatever they need. How to set the Cloud Public system so it generates a warehouse task for moving the full 2 bags and not only 7 kg?
Best regards
Request clarification before answering.
Hello,
you can set this up on the following levels:
Warehouse process type:
Storage type:
Regards Johannes
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
difficult to say without seeing all the data. Have you setup the quantity classification?
Please check the documentation:
Rounding warehouse tasks (WTs) to whole units.
You can configure how the WT quantity should be rounded. You can do this at storage type level and in the warehouse process type.
You can set up the following rounding mechanisms:
The rounding logic is based on the following data:
Process: If a WT was created and you have switched on rounding, the system checks the quantity classifier for the warehouse at storage type level, and in the product master. The system searches for a match in the configuration activity Define Unit of Measure Attributes and rounds the WT quantity according to the unit of measure that is maintained there.
Example
In bulk storage, you do not normally want to manage partial pallets. Partial pallets should be picked from a special partial pallet storage area. The following example should clarify the effects this switch can have on system behavior.
The requested quantity is 2.5 pallets. The quantity in the bin is 5 pallets:
@castin, without testing the specific scenario I cannot say, if this will work somehow. I provide here a link with more information (not specific to public cloud). Perhaps that will help you. If not I would suggest to open a new question because this one is already solved and nobody will have a look at it. https://community.sap.com/t5/supply-chain-management-blogs-by-members/splitting-of-full-partial-pall...
Regards Johannes
Johannes Schulte | Senior SAP Expert
Email: johannes.schulte@vico-finconsulting.vicoland.com
On behalf of: Vicoland GmbH
Website: www.vicoland.com/sap
User | Count |
---|---|
4 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.