Hi,

We have production order created and released as part delivery based Prod. integration.

outbound delivery created is distributed to EWM as posting change.

Picking and staging of components are done using Pick HU and the components are in PSA BIN. ( Please note that consumption is not posted yet).

At this point business decides to cancel the production order and the components need to be reversed and put back to source bin. How to achieve this ? I tried CANCPICK, but it does not work.

Accepted Solutions (0)

Answers (2)

Answers (2)

veereshkrs
Explorer
0 Kudos

Hi Shashidhar

Did you consider using the ad-hoc tcodes ADPROD and ADHU?

I don't think PSA staging WTs can be canceled as in outbound picking using CANCPICK.

Veer

0 Kudos

Requirement is to reverse the components picking and then delete the OBD (posting change). Not internal transfer

Ajit_Routray
Active Contributor
0 Kudos

Hi maverick_1976

"At this point business decides to cancel the production order and the components need to be reversed and put back to source bin. How to achieve this ? I tried CANCPICK, but it does not work." -> CANCPICK would not work. Please try web dynpro application/Fiori - /SCWM/MFG_STAGING_REVERSAL for clear PSA/Staging reversal. Search /SCWM/MFG_STAGING_REVERSAL (/SCWM/MFG_STAGING_REVERSAL) in SAP Fiori Apps
Kind Regards,Ajit
0 Kudos

Thanks Ajit.. the challenge here is my client is not using Fiori even though we are in 1909. I tried searching for any GUI T.code which can do the reversal of staged components, but in vain..

I explore further on /SCWM/MFG_STAGING_REVERSAL.

Thanks

Shashidhar

Ajit_Routray
Active Contributor
0 Kudos

Hi maverick_1976

Please read delivery based Staging Reverse (Put back process)

https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/9832125c23154a179bfa1784cdc9577a/51e82bfc69a74b6fa39...

"Requirement is to reverse the components picking and then delete the OBD (posting change). Not internal transfer" -> As per my experience, you can't delete legally the OBD once distributed.

"Requirement is to reverse the components picking" -> Manually return using ad hoc movement

"delete the OBD (posting change)" -> In ERP, reset distribution status of delivery via FM /SPE/DELV_RESET_DIST_STATUS. then reverse material document then try to delete (EWM Deliver would not delete) ...Please handle with care 🙂

The above opinions are my own so not related to standard SAP.

PS: My apologies , the previous comment based on PMR not delivery based.

Kind Regards,