How to delete job logs in ibp

Former Member

Accepted Solutions (1)

Accepted Solutions (1)

ankpatel
Contributor
0 Likes

Hi Anurag,

You can use the Global Parameter - Scheduling - JOB_RETENTION_TIME = Number of days that executed jobs are retained.

This parameter is only valid for planning operator jobs.

Regards

Ankur

Former Member
0 Likes

Hi Ankur,

Thanks for the response. It worked.

Regards,

A. Basu

Answers (2)

Answers (2)

rupesh_brahmankar
Active Contributor
0 Likes

Hello,

Please refer SAP note See 2345820 - How to purge data from the data integration reporting table

Bets Regards,

R.Brahmankar

former_member194529
Active Contributor
0 Likes

Hi Argha,

INTEGRATION => STAGCLEANUP

global parameter is also important in case you perform a lot of data integration jobs, in order to delete frequently the staging table at the database level, along with the data integration logs in the system.

Best,

Ivan