How to close the supply chain network in SAP7F planning area as it is not generating receipts

0 Kudos
369

For a simple supply chain network for a product PROD1 in Plant and DC and Component COMP1 in Plant which should get from vendor .

Created TLane between DC to Plant

Created PDS for PROD1 in Plant with component.

when I ran the Supply run ,orders are not created giving the gating factor as No source of supply for COMP1in PLANT is detected

I have maintained TLANE from VENDOR to PLANT for COMP1

Now Supply run gave the gating factor No source of supply for COMP1 in VENDOR

How can we close this network as we don’t need where Vendor is procuring or producing?

Note: when we created PDS for COMP in VENDOR location it created orders which is wrong.

Accepted Solutions (1)

Accepted Solutions (1)

guglanigaurav1987
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Ravindra,

Have you created the Raw materials at Vendor Location in your Location Product Master data? It is not desired in IBP OBP for a location type 'V'.

Please delete Location Product MD entry for Component Vendor combination and rerun your supply planning algorithm?

Regards

Gaurav

0 Kudos

Hi Gaurav,

Initially with out creating vendor only i have ran it for which it gave gating factor as No source of supply for COMP1 in PLANT.

Thanks

Ravindra

guglanigaurav1987
Product and Topic Expert
Product and Topic Expert
0 Kudos

Please remove the Location product entry for the component at Vendor and rerun the heuristic. then Share the snapshot of
a. Gating Factor
b. Vendor Master
c. Location Product 'Procurement Type' at Component at Plant_1.
d. Validity Flag of Transportation lane from Vendor to Plant

0 Kudos

Hi Gaurav,

After deleting location product entry of component at vendor it worked as expected.

Thanks for the time and detailed insight.

Thanks

Ravindra