How to check storage level of planning area in IBP

Former Member
0 Likes
625

Hello Experts.

In the previous versions of IBP, there was an option in Planning Area configuration to check the storage level of that planning area i.e Day/Week/Month etc. Now, in the latest version how can we check which is the base level of storage for time dependent attributes? For example, if we have to maintain lead time - how can we check which time level will it be uploaded? In KF, we can check the storage levels, but how can we do generally by looking at the Planning area or the Time profile assigned to it?

Regards,

A.Basu

Accepted Solutions (1)

Accepted Solutions (1)

piyush_parekh
Active Contributor
0 Likes

Hi,

In Planning Area fiori app, under General header, you can check assigned time levels for that planning area. These levels and other details are listed as Planning Horizons.

If I understood the question correctly, if you want to see base planning level of time dependent attributes e.g. PLEADTIME, you can go to Attribute as a Key Figures header in the same fiori app, go to settings (gear in the right side) and mark Base Planning Level checkbox. You should see base planning levels of all attribute as a key figures.

Regards,

Piyush

Former Member
0 Likes

Hi Piyush,

Thanks for the response & detailed explanation. Really appreciate.

Regards,

A.Basu

Answers (1)

Answers (1)

Irmi_Kuntze
Product and Topic Expert
Product and Topic Expert
0 Likes

Piyush is right. Check this recording on the new app, it is really extremly helpful and should be mandatory for every consultant:

https://dam.sap.com/a/Z5McRrp