on ‎2025 Mar 06 4:02 PM
I have two resources that are capable of producing the same items. In Production Source Resource I have the two resources entered under the same SourceID (not sure if this is correct?). When I run the heuristic it's taking capacity off of both resources for this item, but it's not accounting for total capacity between the two resources. Ideally it would use a designated resource first and then when that one is full switch over to the other resource, but I was hoping at a minimum it would at least add the capacity of both resources together so when it allocates production it's pulling the correct capacity utilization.