How do I consume independent demand requirements at the plant level?

Former Member
0 Kudos
235

How do I set up materials so that they are consumed at the plant level when materials are received or post goods issued from production instead of when they are sold to a customer?

Accepted Solutions (0)

Answers (1)

Answers (1)

ajitkumar
Active Contributor
0 Kudos

If you mean consumption of your requirements thru a production order, try strategy 70. in MRP.