on 2021 Apr 22 9:59 AM
Hi experts,
I am configuring frozen horizon for transport with the link but face an issue. Plz help me.
<What I wanna do>
first of all, my supply chain model is this. There are Plant, DC, and Customer. Product "IBP-100" is transported following this route.


<What I have done>
First I set the value of frozen horizon as 10 in Location Product MDT as following image indicates. so that frozen horizon would be 10 weeks.

Second, I adjusted the value of customer demand as 200 from the current week to the last week in 2021.

Third, I run the heuristic. the problem is that the value of minimum transport receipts/supply is prioritized even when it is outside frozen horizon. in other words, when frozen horizon is over(from CW26), I think the value of Transport receipts/ supply should be 200(as set in Adjusted Dependent Customer Demand).


So the above is my situation. Plz ask me if you need additional information I forgot to offer in this post. It seems I should have done something else, but no idea about what it is.
The Best,
Kenta Kono
Request clarification before answering.
This is standard behavior for transport KF (Refer your post comments - result of heuristic run is not what is expected Frozen Horizon for Tranpsort | SAP Community )
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Girish,
I understood your point. But is there any way to confine the impact of MINITRANSPORT only within the period considered as frozen horizon. My point is that I do not want the value of Transport Receipts after frozen period to be impacted by the value of MINITRANSPORT.
The Best,
Kenta Kono
| User | Count |
|---|---|
| 8 | |
| 7 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.