I am trying to test Forecast consumption against sales orders created locally in APO using CTMTESTDATACREATE.

Settings are maintained in the product master for forward / backward consumption

Standard SNP Macro step is in place.

But forecast consumption is not happening. The total demand is simply a sum of Forecast and Sales order and Distribution Demand.

THERE IS NO CONNECTED SAP ERP system. There is no integration with any ERP system.

.

Accepted Solutions (0)

Answers (1)

Answers (1)

planning_is_an_art
Active Participant
0 Likes

Often the StrategyGroup in the material master in APO is missing (/SAPAPO/MAT1 -> tab "demand" -> sub tab Requriement Strategy --> field "proposed strategy". If this is missing the system cannot determine segments to apply th fcst consumptions. Try strategy 20 planning with final assembly (which is mapped from ERP StrategyGroup =40).