execution skipped due to empty planning horizon

Former Member
0 Kudos
369

Due to business requirements, we have created new planning levels and modified all of input and output keyfigures to a DAY level for Time Series.

To match this configuration with the operator and because none of the SCM operators is directly modifiable at day level, we have run a job with the operator assigning an operator profile with day level.The result of this is a "finished" run but without calculations or results, its empty.

The log shows the following message:"SCM operator algorithm HEURISTIC execution skipped due to empty planning horizon".

An important point to consider is that when loading master data, IBP does not generate planning objects in a natural way, as it happens in a standard way.Therefore, we thinks it’s running without planning objects.

How can we solve this issue?

Accepted Solutions (1)

Accepted Solutions (1)

lingaiahvanam
SAP Champion
SAP Champion
0 Kudos

Hi,

Check the planning area planning horizon day period once again and run the operator.

planning-horizon.png

If you still have issues upload forecast at day level and run operator.

Best Regards,

Lingaiah

Answers (1)

Answers (1)

Former Member
0 Kudos

Thank you, Lingaiah

The planing horizon is exactly the same as your image, and the forecast is also at day level.

Regards,