on ‎2020 Jul 24 2:13 PM
Hi gurus,
I'm trying to do the picking process with HU nested with the process-oriented storage control process, But I have a problem when the second WT is being confirmed from the picking point (which is also a work center). Users are going to do this second WT confirmation from the work center APP (SCWM/PACK) (not from RF), and this second WT is not possible to be confirmed from this APP.
In the image below you can see the WT assign to the origen HU 123456781000005820 which is nested with the HU 123456781000005837. I want to move the stock from 123456781000005837 to 123456781000007893 but when I try it I have the same error:

On the other hand, I can do this process without nested HU. I can do as well this process with HU nested from RF.
Any of you knows if I have to something special in customazing to achieve this process with HU Nested? or, Any of you have/had the same problem and knows how to solve it?
Thanks,
BR
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi German,
I think your request isn't possible. Your users must confirm from RF
BR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.