on 2023 Feb 14 11:03 PM
If we are planning for Embedded EWM :
1) Do we need to configuration traditional warehouse WM1 and next configuration steps as well(S.type,S.section,stratergies,ect.) (or) we just need 3 digit warehouse only.
2) Do we connect WM and EWM warehouses for Embedded EWM ?
(or) we create new EWM Warehouses and respective S. Types, S. Sections, strategies etc. only (no need of regular warehouses and its configurations)..
Can you confirm on this process.
Thanks,
Venky
Request clarification before answering.
1) Not required to configure storage type. Just the 3 digit warehouse number and its assignment to plant sloc etc.
2) Yes. That is how the deliveries from ERP get distributed to EWM.
3) we create new EWM Warehouses and respective S. Types, S. Sections, strategies etc. only (no need of regular warehouses and its configurations).. - This is essential to process the deliveries received from point 2 in EWM.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I did below BASIS setting for connections and all. I think all are good. BASIS checked it as well. I think pre-activation is good.
1. Defining RFC Destination
2. Defining Dummy Logical System
3. Determining RFC Destinations for Method Calls
4. Determining RFC Destinations for Method Calls from SAP S/4HANA EWM
5. Defining Queue for Transfer to SAP S/4HANA EWM
6. Setting the QOUT Scheduler
7. Defining the Business System
8. Defining Own Business System
9. Maintaining Business System Group
10. Assigning Logical System and Queue Type
11. Setting Control for RFC Queue
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Venky,
The following documents can help:
Here you can find a list of how to guides.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Venky, all I know about is listed at the how to guides.
Hi Venky,
2) Do we connect WM and EWM warehouses for Embedded EWM ?
Since both are on the same system you connect embedded EWM using a dummy logical system.
Download the latest document for your SAP system version "Administration Guide to Implementation of SAP S/4HANA (i.e. 1909) with SAP Best Practices". Look for a section Pre-Activation Settings for EWM Scope items. This is a Basis task but must be set up to make the connection.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
6 | |
4 | |
3 | |
2 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.