on 2023 Feb 21 3:59 PM
Hello Experts,
I have the following scenario for one of my clients. So far, one IM storage location (0110) EWM managed. One storage type 5000 (multiple storage bins) representing the warehouse, and another storage type 0050 (fixed bin with sometimes several fixed bins per material) representing the shopfloor where there are some racks…. Generally, items are mainly stored in fixed bins in the shopfloor, and in case of overflow the same item can be stored in the warehouse as well. In the warehouse can be stored low turnover items as well. My customer would like to automatically trigger the components staging from the warehouse (storage type 5000) to the work center and backflush the quantity in the PSA, and automatically backflush in fixed bin for components stored in storage type 0050 (supermarket). I might use PMR functionality. Any idea to cover that business requirement? For me we have to stage components to the PSA in both cases.
Thanks for your feedback
Regards
Bruce
User | Count |
---|---|
9 | |
3 | |
3 | |
3 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.