on ‎2018 Sep 12 5:12 AM
Freight Unit has a source location and a destination location. In case purchase order which is ordered from supplier to a plant is created, FU destination location generated from the PO was a shipping point under the plant by default. The shipping point is generated in the TM location master as well.
Does anyone know why the shipping point is passed as the destination location in TM?
Request clarification before answering.
This may be because a goods receiving point determination is configured. Please check this configuration.
SPRO-LE-Shipping-Basic Functions-SP & GRP determination-Assign GRP for IBD
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.