on 2021 Jun 08 5:13 AM
Hello,
I am trying scenario in SAP EWM 1909 of staging the material via MF60 when destination PSA is IM managed and source sloc is EWM managed. After releasing process order and MF60 execution I am expecting system should create delivery. But it is not happening. Even system is not giving me any error after MF 60. Execution components are blank in MF60.
What are the step by step setting in the system so that after releasing process/production order and MF60 system create delivery?
Thanks,
Milind
Request clarification before answering.
Hi,
the step-by-step settings are described at the place where you always should look first: at help.sap.com. Search for ewm (no matter if you have SCM based, S/4HANA based, or embedded EWM). On the Extended Warehouse Management page you find a link to the "How-to-Guides". And in there you find a document called "production_integration.pdf", "How to Configure Production Integration" (https://wiki.scn.sap.com/wiki/download/attachments/451060111/Production_Integration.pdf?api=v2). And on page 4 the documents lists the settings which are created by the BC set (so you can either run the BC set or set it up by yourself).
Brgds
Juergen
---
All of the above is no official SAP statement.
Want to learn EWM?
Check for EWM courses: https://training.sap.com/search?q=ewm
Get a SAP Learning Hub Subscription: https://training.sap.com/learninghub
And it is EWM. NOT eWM - Duh!
And if your question includes the word "transfer order" - do NOT tag the question with Extended Warehouse Management!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Thanks lcaglar. I have gone through the document. It helpful!
Why I required pull scenario with MF60 is, in EWM PMR S/4 EWM scenario, when staging completed with /SCWM/stage, and goods are completely issued from PSA, if user use /SCWM/stage with same production /process order which was staged earlier, system once again trigger staging proposal. Is there any way where by, in PMR scenario, once the production /process order competed staged, system should not provide staging proposal again. Or whether there is any setting in /SCWM/PSASTAGE transaction which checks whether production order staging completed already.
Thankshanks,
Milind C
Hi,
"Is there any way where by, in PMR scenario, once the production /process order competed staged, system should not provide staging proposal again"
Yes, you close the manufacturing order. The PMR is never "completely" staged. That is the difference between delivery based production integration and advanced production integration. In delivery based integration you have a warehouse request, and staging is for exactly the quantity in this warehouse request. In advanced production integration you stage the multiples of the quantities you assigned in the EWM control cycle, as long as there is an open manufacturing order.
Brgds
Juergen
Hi,
You can find a detailed documentation about EWM-PP integration on the below link. It is not a one step setting.
EWM-PP integraton document on my LinkedIn Profile
Hope it helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 12 | |
| 10 | |
| 8 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.