cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Delivery not created after MF60 execution in S/4 HANA embedded system...

former_member435196
Contributor
0 Kudos
1,582

Hello,

I am trying scenario in SAP EWM 1909 of staging the material via MF60 when destination PSA is IM managed and source sloc is EWM managed. After releasing process order and MF60 execution I am expecting system should create delivery. But it is not happening. Even system is not giving me any error after MF 60. Execution components are blank in MF60.

What are the step by step setting in the system so that after releasing process/production order and MF60 system create delivery?

Thanks,

Milind

Accepted Solutions (0)

Answers (2)

Answers (2)

JuergenPitz
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi,

the step-by-step settings are described at the place where you always should look first: at help.sap.com. Search for ewm (no matter if you have SCM based, S/4HANA based, or embedded EWM). On the Extended Warehouse Management page you find a link to the "How-to-Guides". And in there you find a document called "production_integration.pdf", "How to Configure Production Integration" (https://wiki.scn.sap.com/wiki/download/attachments/451060111/Production_Integration.pdf?api=v2). And on page 4 the documents lists the settings which are created by the BC set (so you can either run the BC set or set it up by yourself).

Brgds

Juergen

---

All of the above is no official SAP statement.

Want to learn EWM?
Check for EWM courses: https://training.sap.com/search?q=ewm
Get a SAP Learning Hub Subscription: https://training.sap.com/learninghub

And it is EWM. NOT eWM - Duh!
And if your question includes the word "transfer order" - do NOT tag the question with Extended Warehouse Management!

former_member435196
Contributor
0 Kudos

Hello,

Thanks lcaglar. I have gone through the document. It helpful!

Why I required pull scenario with MF60 is, in EWM PMR S/4 EWM scenario, when staging completed with /SCWM/stage, and goods are completely issued from PSA, if user use /SCWM/stage with same production /process order which was staged earlier, system once again trigger staging proposal. Is there any way where by, in PMR scenario, once the production /process order competed staged, system should not provide staging proposal again. Or whether there is any setting in /SCWM/PSASTAGE transaction which checks whether production order staging completed already.

Thankshanks,

Milind C

JuergenPitz
Product and Topic Expert
Product and Topic Expert

Hi,

"Is there any way where by, in PMR scenario, once the production /process order competed staged, system should not provide staging proposal again"

Yes, you close the manufacturing order. The PMR is never "completely" staged. That is the difference between delivery based production integration and advanced production integration. In delivery based integration you have a warehouse request, and staging is for exactly the quantity in this warehouse request. In advanced production integration you stage the multiples of the quantities you assigned in the EWM control cycle, as long as there is an open manufacturing order.

Brgds

Juergen

lcaglar
Explorer
0 Kudos

Hi,

You can find a detailed documentation about EWM-PP integration on the below link. It is not a one step setting.

EWM-PP integraton document on my LinkedIn Profile

Hope it helps.

former_member435196
Contributor
0 Kudos

Hello,

Good document. But I am specifically looking for MF60 staging resulting creation of Outbound deliveries. Looking for step process of settings or prerequisite for creation of OBD via MF60?

Thanks,

Milind