hello Community,
I face an issue where I need to fill in Transportation Cost Rate KF which belongs to Period Product Location To Location Planning Level.
This PL has as root attribute Product ID, Location ID and Ship-to Location ID.
Ship-to Location is only available as a Reference MDT, thus making it impossible for me to upload an attribute as KF to create the Planning Objects on that planning level.
I tried to use a Copy operator with "Create missing time periods" and Generate missing Planning Objects" options but nothing will create those PO... Creating them manually in the Excel Interface is not an option 🙂
Any idea how I could do that?
Many thanks for your inputs.
Adrien
Request clarification before answering.
Hi,
2 Options
1. Convert Location source reference MDT as simple MDT like Location source, then follow attribute as a KF approach to create planning objects.
2. Using CPIDS load a custom KF at WKPRODLOCLOCTO planning level to get the combination created followed by running copy operator to "Create missing time periods"
Thanks
Girish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you for your feedback.
So, there's no way to use copy operators to do that. I hoped I was misusing them as I read everywhere that you can create planning objects with them, with the right set up.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 14 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.