on 2018 Aug 27 8:49 PM
Dear Gurus,
We are trying to ship a prepack HU for a customer order and is there any Badi or FM available to create a HU warehouse task instead of Production warehouse task.
Thank you
Nagendra
Request clarification before answering.
Dear Lopez,
we are not packing with reference to ODO. We receive these Pre-pack HU's with multiple materials in one HU from vendor through ASN which are updated in inbound delivery on ECC and transferred to EWM and finally putaway with reference to inbound order using HU task. Now we have an customer order with exact match in each prepack HU. Our issue is if there is only one material in the HU, system is creating the HU task with reference to ODO and we are able to confirm it. But if the HU has multiple materials it is creating the product task and not HU task. This is creating lot of issues on the floor as they bring to package to pack center, all the units are not packed and now they have to scan each item back into HU but physically all the products are already in the package. there could be an order with 1000's of HU's with minimum 8 items in each HU.
So is there a way we could create a HU task instead of product task.
My scenario
Prepack HU data;
Mat1 = 2 Ea
Mat2 = 1 Ea
Mat3 = 4 Ea
Mat4 = 1Ea
Delivery created for
Mat1 = 200Ea
Mat2 = 100Ea
Mat3 = 400 Ea
Mat4 = 100 Ea
Now we want to create 100 HU task as we are picking 100 HU's where as system is creating 100 product task for each delivery line.
Thank you
Nagendra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 7 | |
| 6 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.