on ‎2015 Dec 08 4:43 AM
Hi Team,
Can anyone help in understanding on how to configure storage location capacity constraint in SAP4 in IBP version 4.0.2.2. Below is the network:
1. Customer
2. DC
3. Production plant
A DC can procure material from multiple production plants and DC has a constraint on maximum storage capacity. We need to configure maximum storage at DC (period and location level) and products will consume storage unit/capacity.
Regards,
Aditya G
Request clarification before answering.
Hi Aditya,
Storage capacity as constraint is not yet supported in IBP Supply Optimizer.
We are interested in understanding the use case/requirement
Thanks,
Pramod
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 5 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.