on 2016 Apr 12 8:28 AM
Hi,
after creating batches by using MSC1 in LSMW and creating a batch input map. the batches are in the ERP-System but not in the SCM System.
By creating Batches with MSC1N manually, the Batch is ciffed to the SCM-System.
I have an active Integration model for material master witch Batch, running every hour.
The setting for Material Master Change Transfer in the CFC9 is set to "2"
Is there anyone with experience in creating batch-master data for Migration?
Thanks for all info
Bernd
Request clarification before answering.
Hi,
Have you CIFfed your classes/characteristics before CIFfing batch?
Basically BTE will work whenever changing the masters not creating master.
for creating masters you have to use CFM1 and CFM2.
Regards,
Vadamalai A
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
yes - the classes/characteristics have been ciffed.
For creating master data I have a Job with these steps
remoddel
remodgen
remodac2
So the migration steps are
1. Creating Batch for Materail via MSC1 and LSMW
2. running Job with three steps
The Batch is not in the SCM-System:-(
Further more ideas?
Regards
Bernd
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.