Hello all,
Is it possible to assign a material to both Plant MRP and MRP area ? I'd like to create an MRP area for a storage location. The materials have 2 different forecasts and i'd like to plan the 2 forecasts separately one in Plant MRP and the other in MRP area.
Thanks for the help
Chaymae
Request clarification before answering.
Definitly you can do it . Material can be done but I would suggest do it for MRP area. If it required entire plant so add all locations or selective then it can be done selectively.
If both are different then easily you can do