Can one material be assigned to both Plant MRP and MRP area ?

0 Kudos
172

Hello all,

Is it possible to assign a material to both Plant MRP and MRP area ? I'd like to create an MRP area for a storage location. The materials have 2 different forecasts and i'd like to plan the 2 forecasts separately one in Plant MRP and the other in MRP area.

Thanks for the help

Chaymae

Accepted Solutions (0)

Answers (1)

Answers (1)

MohdRashid
Active Contributor
0 Kudos

Definitly you can do it . Material can be done but I would suggest do it for MRP area. If it required entire plant so add all locations or selective then it can be done selectively.

If both are different then easily you can do