I have a requirement where I need to assign 3 separate WOCR to 1 WPT in outbound POSC step. So that, 1 delivery may create separate WO with separate WOCR - but they should tied to the same WPT.
I do realize that WPT and WOCR has 1:1 relation in outbound POSC at first place so it can't be possible with standard SAP solution and hence, I am open for any suggestions to achieve this functionality.
Requirement Example - OD has 111 pcs of material A - where 100 EA = 1 pal, 10 EA = 1 CAR and 1 EA. they are stored in separate storage types with quantity classification in place. Client wants to create 3 separate WO for pallet, Carton and EA level and wants to perform separate POSC steps so how can I achieve this functionality.
Please throw some lights or potential solution steps and I will be grateful.
Thank you,
Jaimin
Request clarification before answering.
Hi Jaimin,
No need to develop here, the requirement is covered by standard.
From what I understand, what you need is the following configuration:
- each of the three storage types needs to have its own activity area
- define three different WOCR, each one with the same filter (filter on WPT), one for each of the three different storage processes (and activity areas)
- maintain WOCR determination sequence for each of the activity areas, so that each activity area receives its own specific WOCR
The storage process for POSC is not determined by WPT in outbound processes, but by the WOCR.
Best regards,
Jonas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jonas,
I have done all the config already that you have mentioned but POSC is not getting triggered if I don't assign WOCR to WPT.
As per above settings, system is creating 3 WO based on my need but they are not going to next step POSC step so it's not useful in my case.
I need 3 separate WO and they should follow separate POSC.
Thanks,
It's definitely working this way in standard. Check the following points or provide screenshots:
- Does the warehouse task contain the storage process? (Probably doesn't?)
- Does the WO contain the respective AA? i.e. Are the bins sorted?
- Does the WPT contain field storage control NOT = 2 (POSC not relevant)?
Hi,
Jonas and Chethan have give you already the correct way for your requirement: you determine the WOCR via the activity area (and the proper activity).
If it does not work - check the warehouse order creation log to find out what is missing.
Brgds
Juergen
---
All the above is no official SAP statement.
Want to learn EWM?
Check for EWM courses: https://training.sap.com/trainingpath/Applications-Extended+Warehouse+Management-EWM+in+S4HANA
Get a SAP Learning Hub Subscription: https://training.sap.com/learninghub
And it is EWM. NOT eWM - Duh!
And if your question includes the word "transfer order" - do NOT tag the question with Extended Warehouse Management!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
System will definitely create 3 different tasks if they are in 3 different AA's
So it should be possible to have 3 WOCR for all 3 AA's / WTs
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.