Calculating max production output based on on-hand component quantity

Former Member
0 Kudos
158

I have a client who requires that a calculation take place while reviewing planned orders. The user would like a calculation of the max amount of a Finished Good that could be produced based on current inventory quantities of components. That is to say, calculate the largest production order quantity possible based on the lowest component inventory quantity available prior to the creation of the production order. Is this something that could be configured or custom? How would I go about designing the calculation?

ECC EHP6/7.