on 2019 Aug 01 2:33 PM
Hi All,
I am trying to post a goods movement through the BAPI_PRODORDCONF_CREATE_TT, I am populating the entry_qnt as 6 and entry_uom as LB in the goodsmovement table. The goods movement is happening successfully, but when i check the documented goods movement the posting is 6 EA, instead of 6 LB. The Base unit of measure for the material is 'EA'.
Request clarification before answering.
Hello,
Are you posting the confirmation against the production order/resrevation?
Please check quantity and unit of measure in production order component CO03.
A quantity in base unit of measure is provided to the BAPI from Goods movements which determined for backflushing.
Please refer this useful wiki page on it,
How to use BAPI_PRODORDCONF_CREATE_TT to make confirmation
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
I am passing the reservation number along with the Quantity and UoM in the table for BAPI. In the Production Order the component has value as 2 EA. But the requirement is to post the Goods Movement by converting the quantity to LB. When I pass the Quantity as 6 LB. System is ignoring the UoM and only considering the quantity value.
In Short:
1. In Production Order -> Component 2EA
2. Posting through BAPI -> 6 LB against reservation, but in system it is being posted as 6 EA.
3. Conversion maintained in material master.
Note: I do not encounter this issue if i post the movement through MIGO.
Regards,
Deb
Hello,
Good movement are posted in base unit of measure. You can enter good movement in alternate unit of measure, however it post with base unit of measure.
I posted MIGO good issue as 4 gram system converted it to base unit of measure 0.004 KG

You can enter a goods issue in the unit of issue of the material. The system then automatically converts the specified quantity to the stock keeping unit.
Refer useful SAP help document on it.
Units of Measure in Inventory Management
You just need to be sure that conversion factor of this new unit is maintained in material master; system will pick this conversion from material master. And unit of issue in work scheduling tab of material master is maintain.
6 LB against reservation good issue should post 2 EA .
Otherwise use UoM EA instead of LB in the BAPI.
Best Regards,
R.Brahmankar
| User | Count |
|---|---|
| 8 | |
| 7 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.