Hello everyone,
I have a production order where I book all my movements via backflushing. Right now I need to enter a batch in the components list. I have set up the flag, that the batch determination is supposed to happen in the ewm. If I set the GI up, to be synchron I get the error in the COGI, that the batch needs to be entered. When I book the consumption not synchronous, and I have an outgoing delivery, I need to enter the batch manually. Is it possible to let the system look for fitting batches on the EWM side? And would it work with a synchronous goods issue?
Thanks for the help.