cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

APO projected waste volume

kubra1
Member
0 Likes
258

Hi!

Is there a setting in SAP where the Projected waste volume in APO is deducted from the stock ultimo after the last available shipment date for that batch ? Please see the picture for reference example.

Thanks!!

Accepted Solutions (0)

Answers (0)