on ‎2021 Sep 02 4:36 PM
Hi Experts,
I have a question about the Product View transaction (/SAPAPO/RRP3). In the below example, two reservations are considered in the calculation of the requirement elements

One of them is confirmed, and the other one is not confirmed and showing the message /SAPAPO/ATP_BOP092

The one which has not been confirmed has the requirement date 01.01.2038; any reservation before that date is confirmed and any reservation after it is not confirmed. My question is; based on what this date has been determined to be the threshold for not confirming the requirement even when no checking horizon has been maintained in the location-specific product master.
Is the 'Receipt Days' Supply' which has here the value of 5,964.07 a factor in the quantity confirmation? and if so, how it is calculated?
Request clarification before answering.
Hello,
An availability check is performed with a requested date maximal possible 31.12.2037
But why are looking for confirmation so far out in future , I even dont think beyond my retritment 😉
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Brahmankar,
Thank you for the answer, the point is; not actually looking for a confirmation so far in the future, sometimes the exact date on which the product is needed; is not known. That's why the requirement date is entered for example 31.12.9999 and then the quantity will not be confirmed.
My question now, is there any documentation for this limitation?
Best regards,
Abdelaziz
Hello,
Please read carefully SAP KBA,
Best Regards,
R.Brahmankar
| User | Count |
|---|---|
| 12 | |
| 7 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.