on ‎2015 Mar 19 8:18 PM
Hello All,
It will be of great help if somebody can share some examples on extended Safety stock planning methods(BT,BS,AT,AS). I have tried SAP help and SCN but none of them contains the actual calculation logic. I would require the calculation logic along with some examples.
I would like to validate the numbers when I configure the system and generate the number safety stock numbers.
Request clarification before answering.
Dear Abhijt
Did you checked the following link.
It´s difficult to provide the examples as you are require to consider the multiple factory.
Extended Safety Stock Planning - Supply Network Planning - SAP Library
Thanks
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 15 | |
| 9 | |
| 8 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.