on 2024 Feb 04 3:24 PM
Hello all,
we are implementing Advanced Production Integration in a decentral SAP EWM.
In one storage hall are three production lines and we currently use one PSA for these lines.
There are a few articles that will be staged with Crate Part Replenishment or Cross-Order Staging on specific bins in the storage hall.
But there is also a batch managed material that is required on each production line and needs be staged next to the respective line.
How can we achieve this? Do we need to create one PSA per production line so that we are able to maintain the specific storage bin per production line in the staging rules?
Thank you in advance.
Best regards
Julian
Request clarification before answering.
Hi Julian, yes, you would need to have several PSA-s to stage same product to different bins in standard.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
6 | |
5 | |
5 | |
1 | |
1 | |
1 | |
1 | |
1 | |