Supply Chain Management Blogs by Members
Learn about SAP SCM software from firsthand experiences of community members. Share your own post and join the conversation about supply chain management.
cancel
Showing results for 
Search instead for 
Did you mean: 
Former Member
1,333

When you define a transportation lane, there are a couple of indicators that can seriously influence the result of your planning. The indicators I am referring to are the fixed transportation distance and duration indicators. As the name indicates, checking these options will ‘fix’ the distance and duration during planning and not try to determine them.

The indicators I am referring to are shown below:

ScreenShot054

Let’s take the use case and assumptions below:

  • I am planning transports between two zones that are in the metro area of a city and very close to each other,
  • I have no GIS system integration,
  • I have maintained the Geo coordinates of my zones manually (approximately the centre point),
  • I have assigned post codes to my zones  (the optimiser will determine to which zone a location belongs to based on that information),
  • I use many one time addresses (standard SAP logic assigns the region’s centre point  Geo coordinates to my one time locations).

If I put these elements on a map I have the following:

  • The red zone is my Perth City zone,
  • The blue zone is my Perth zone,
  • I am also showing the centre of WA, Australia – that is the geo location that all my one time locations will have. By saying this I’m trying to stress the fact that many addresses will be physically geo located in the City of Perth, but from a TM point of view, they will all be in the centre of WA, Australia (some 1000+ kms away from their real location).

ScreenShot035

So let’s see what happens if I plan a few freight units and have the ‘fixed’ indicators off in my transportation lane.  TM has used the actual Geo locations of my individual locations and has dynamically at run time calculated a straight line distance and duration for each of my legs. As can be seen from the scheduled  times and dates, my transport will take over 36 hours to complete approximately 80 real life kms!

ScreenShot056

Now let’s see what happens  if I plan a few freight units and have the ‘fixed’ indicators on in my transportation lane.

ScreenShot055

That’s better. This time TM has simply used the fixed times and distances that were indicated in my transportation lane. TM now tells me that this tour should take approximately 2 hours – which is much closer to what this will really be!

1 Comment
Labels in this area