Welcome to the latest updates on SAP Best Practices for SAP Integrated Business Planning (IBP). In this blog, we will highlight the significant enhancements and updates introduced with release 2505. In the following sections, you will find the details.
Enhancements in the SAPIBP1 Sample Planning Area:
In the latest updates to the SAPIBP1 sample planning area, several enhancements have been introduced.
Usage of new attribute Forecast Algorithm
New setting in inventory profile app
Inventory Budget Entitlement
With the 2505 release, we are excited to introduce a new solution process called IBP for inventory – inventory budget entitlement (7UL). This new solution process allows for the integration of budgetary constraints within the inventory planning process. Incorporating inventory budget into the inventory planning process enables you to effectively balance service level targets with your available budget. This approach ensures better-informed financial decisions regarding the maintenance of safety stock levels while adhering to an acceptable predicted service level.
The new solution process offers several advantages, including:
To facilitate this new solution, we are introducing a new workbook for inventory planning within the Planner Workspace. This workbook comprises multiple tabs that display essential key figures for this process, such as the available budget for each product family and location region, distributed budget per location product, or safety stock recommendations based on the available budget. The budgeted safety stock recommendation also serves as one input to calculate the predicted service level. Additionally, you can visualize the results in a dedicated page within the Analytic Story for Inventory. This page effectively demonstrates the distribution of the budget and the impact of budget limitations on service levels.
Here are some screenshots that offer a glimpse into the new solution process. The first screenshot displays the available budget per location region and product family.
Planner Workspace: Available Budget
In the next screenshot, the budget is disaggregated to the level of location product using a new copy operator. By utilizing different calculated key figures, the budgeted safety stock recommendation is determined.
Planner Workspace: Budget Disaggregation
The result is used as input for the service level prediction operator and is displayed in the corresponding planning view.
Planner Workspace: Service Level Prediction
In the new page of the analytic story for inventory planner, you can analyse the result using powerful analytic charts.
Analytic Story for Inventory - page Inventory Budget Entitlement 1
Analytic Story for Inventory - page Inventory Budget Entitlement 2
Time-Series-Based Forecast Consumption
We are pleased to announce the launch of a new planner workspace designed specifically for the solution process IBP for sales and operations – time-series-based forecast consumption (3RT). This workspace serves as an alternative to the existing planning view available through the SAP IBP Microsoft Excel add-in. Within this new workspace, users will find both input and output key figures used in the forecast consumption profile.
Planner Workspace: Forecast Consumption
SAP Process Navigator
The final point I want to mention is an enhancement of the existing solution process flows available through the SAP Process Navigator. The enhancement focuses on the S&OP process, making it easier to navigate through the various process steps.
Here some more useful links:
Thank you for reading our release highlights blog. Stay tuned for more updates and enhancements in future releases.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |