Co-Product and By-Product:

A Co-Product is a product that is produced in parallel with other products but have high value. The system creates a separate order item in the production order for each co-product. This means that it is possible to display actual costs at co-product level.

A By-Product is a product that is produced in parallel with other products. The system does not create a separate order item for each by-product. The material valuation of a by-product is always based on the price specified by price control in the material master.

SAP IBP solution does not distinguish between Co-Product and By-Products

 

How to Setup Co-Production in IBP?

SAP IBP Master Data Setup:

Production Source Header:

In the Production Source Header MDT update the Source Type as ‘C’ for Co-Product FG100-CO. C indicates Co-production.

One Source ID ‘1010_FG100_PV1’ is assigned to Finished Product FG100 and Co-Product FG100-CO

ShindeSonal_0-1744192875292.png

 

Production Source Item:

Below is the master data setup for the Production source item.

SG100 is the semifinished material with a source ID ‘1010_FG100_PV1’. RM100 and RM200 are the raw materials with a source ID ‘1010_SG100_PV1’

ShindeSonal_4-1744193266241.png

Resource Location:

Below are the resources available at location 1010 which is production plant. Capacity Supply can keep it blank since capacity supply time series indication is marked as "X"

ShindeSonal_15-1744194930632.png

 

Production Source Resource:

Below are the resources used by source ID

ShindeSonal_7-1744193419779.png

Capacity updated for each resource in IBP:

ShindeSonal_9-1744193449422.png

 

Supply Chain Network:

Network setup for Co-Product Scenario.

ShindeSonal_10-1744193466662.png

Input:

Independent Demand at Finished Good (FG100) and Co-Product (FG100-CO)

ShindeSonal_11-1744193535908.png

Finite Heuristic Output:

Net demand is calculated for finished product FG100 based on the independent demand at the same product.

However Net demand is not calculated for co-product FG100-CO. The heuristics that support co-production don't plan a production event just to satisfy net demand for a co-product. Demand for a co-product is satisfied only from stock. 

ShindeSonal_12-1744193696313.png

Optimizer Output:

The optimizer supports co-production and calculates a cost-optimal production plan. It considers production costs, stock holding costs, and costs incurred for not satisfying demands for all output products, that is, both main and co-products.

Independent Demand at Finished Good (FG100) and Co-Product (FG100-CO) at DC-1000

ShindeSonal_13-1744193819628.png

System has calculated net demand for FG100 till W13 since it has independent demand till W13 only at DC- 1000.However, it has calculated Net demand till W15 at plant 1010 is due to co-product independent demand.

Optimizer has calculated Net demand for co-product FG100-CO at DC due to co-product independent demand.

ShindeSonal_14-1744193941169.png

In W15 we have independent demand only for co-product FG100-CO and system has generated production receipt.

//Setup initial cost Production Cost, Transportation cost, Non Delivery Cost, Inventory holding Cost

I hope this blog was helpful to understand the setup. Thank you.