Introduction:
EWM and PP process integration enables the consumption of raw materials for production and
the receipt of finished goods back into the warehouse.
Workflow:
Differences between Production Order and Process Order:
Advance Production Planning integrates with EWM has two Steps:
1.1 Consumption of Raw Materials:
Configuration:
Production Planning Master Data
Material Master Settings
Testing: