Hi all,
I would like to know the class/method that is responsible for copying changes into active version.
1. Create PO (saved version).
2. Order PO (Work flow triggered i guess).
3. Work item approved. I am guessing this converts changed version into active version(all changes are copied to active version. Change version is closed). Which class/method does this?
Thanks,
Eswar.
Request clarification before answering.
Hi Eswar,
FM BBP_PDCV_UPDATE_ACTIVE is responsible for this.
Send iv_testrun = x for simulation only.
Regds,
Siddharth.