on 2009 Oct 23 5:04 AM
Hi All
What are the advantages of ECC 6.0 EHP4 with SRM 7.0 ?
I have a requirement to connect R/3 BACKEND 4.6 c to SRM 7.0 - What are the functionality we may miss for procurement in SRM as well as ECC?
Has any one experience with 4.6 c with SRM 7.0 - please share your experience.
thanks
muthu
Request clarification before answering.
Hi,
I think you should run the service and check if XML out was generated or not.
Please to a comprehensive note search if there was some note which was created to correct this.
As a last option, you need to debug the badi. May be the purchasing group and the material group which si configured in the badi is not matching the one in the PR.
Sanjeev
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Some link for new functions.
http://service.sap.com/releasenotes
Please note mainstream maintenance for R/3 4.6C was expired.
Software Component Matrix for SAP SRM 7.0 does not have 4.6C because mainstream maintenance was expired.
http://service.sap.com/srm-inst
Regards,
Masa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Masa for valuable information
I would like to know SRM 7.0 vs R/3 4.6 c is compatable or not ?
our requirement is new srm 7.0 with old r/3 4.6 c .
since customer does not want go to EHP4 backend immediately.
srm 7.0 - r/3 4.6 c combination is possible or not. if i could coonect both system , what are the issues may raise.
please guide me .
will SAP recommend this combination rm 7.0 - r/3 4.6 c ?
Strongly What sap will say to customer GO / NO-GO for this combination srm 7.0 - r/3 4.6 .
I indeed appreciate your help.
regards
Muthu
Hello Muthu,
May be below information helps you
Scenarios need EHP4:
Self service procurement -- Not needed
Plan driven procurement -- If you want to user CPPR cenario to convert the PR directly to RFX then EHP$ is required
Service procurement -- To configure the service hierarchies EHP4 is needed
Strategic sourcing -- To have the service hierarchies in Bidding engine then EHP4 is required
Central Contract Management-- EHP4 is Manadatory for entire scenario.
SUS - if you would like to have the SUS (MM-SUS) with service procurement classic, then EHP4 is needed
Apart fromo the above, many of the ESOA service based document exchange will require EHP4 back end. Also if you would like to have Forward error handling facility, you need to have EHP4.
If your customer doent need any of the above scenarios to be implemented then you can have 4.6c back end.
Thanks
Kiran