on 2013 Jun 17 10:56 AM
Hi,
I need to sync the org structure from SRM to ECC. I found tons of documentation regarding the sync from HCM to SRM but no real informations regarding the reverse way. Is it a good way to use BD64 for this with message type HRMD_B? Which range of numbers do I need to take care about? Is there a best practice to sync from SRM to HCM?
Thanks, Vanessa
Request clarification before answering.
i never heard of the possibility of having org structure synched from srm to ecc
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Vanessa,
Since PPOMA_BBP is a lite version of PPOMA/PPOME organizational schema, and it is only designed to allow purchasing structures it is not possible to replicate it to ECC systems.
HR structure are designed in the same basis of lately SRM but with another essential elements (such like infotypes). I never heard someone doing the inverse way, and iI thought it is like replicate Products from SRM to ECC, information necessary to ECC/HR structure is so much more than SRM.
Regards,
SG
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.