on 2011 Dec 22 6:46 PM
Hi all.
We have SRM 7.1 and ECC 6.4 with classic scenario.
I need your help to know how I can send the key fields Control Confirmation and Aknowledge Required from SRM to ECC.
In SRM we use processes: RFQ and order (from shopping carts).
thanks
Request clarification before answering.
yaniVy and Nikhil, thanks for your answers
With reference to Acknowledge, the solution is clear.
However, in the case of the Control Confirmation, my detailed question would be:
We handle a Control Confirmation "Z" in ECC; however, we need that in the time of the creation process of the PO in SRM can send the Confirmation Control "Z" from SRM to ECC.
Is it possible this shipment, using standard settings SRM-MM? Or is necessary to develop this control via BADI?
Please suggestions.