on 2010 Apr 12 9:27 PM
Dear all,
My client has already installed ECC and BI, now it is analyzing the implementatino of SRM.
To have available the reports of BI for SRM, do we need to install another BI instance? Or we can use the same BI already installed that is currently linked to ECC?
Thanks
Ezequiel
Request clarification before answering.
Yeah,you can use the same BI ,you create a new source system at you BW system to connect the SRM system or ECC system.
But you must create the new cube and DSO.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can use the same BI system linked to ECC now.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.