Hi Experts,
i am currently involved in SRM 7.0( Ehp4 implementation(ECS).I never worked on ECS scenario.Could anyone give me the list of steps required for configuring the ECS scenario.
I have performed the settings required for classic senario.I just want to know which steps will differ in configuration for ECS and classic scenario.
i would appreciate your valuable inputs
regards
subbu
Request clarification before answering.
Subhash
All you need is these steps:
1. Activate Extended Classic SCenario in SRM IMG.
2. Define backend system for procurement documents based on product categories. Use Extended Classic PO BADI if you have specific criteria for ECS/Classic differentiation
2. Create document type and number ranges for SRM Purchase Orders. THis number range has to be used in ECC as external number range for creating a copy of extended classic PO
4. Configure workflow for Purchase Orders in SRM.
These are few basic things which are must for Extended Classic Scenario.... Please let me know if you need further details about the same
Regards
Virender Singh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.