on 2016 May 05 1:03 AM
We have to repair/rebuild our SAP Sourcing QA system (version is 9 SP21). What happened in a few words is that the filesystem and database files got corrupted. We did a successful restore of the filesystem but found out that we did not have a database backup that we could use to restore the database. Both Netweaver and Sourcing schema are in the same Oracle database. The current state of this system is that Java instance give SQL error ORA-01578 “block corrupted”. Running utility DBVERIFY shows close to 18000 pages are corrupted that affect both schemas...
I have done much research on SAP Note KBA and SCN, and found the following references:
I also contacted SAP customer support (component SRM-ESO-DB) requesting their recommendation for rebuilding our QA system from a copy of PROD. They confirmed that Note 1594214 would be the guidelines to copy the Sourcing application but that we need to first rebuild the server to have a “clean” Netweaver installation (ie. Not an upgrade. Scratch the old one and start over. Delete database schemas directly in oracle, remove the current software installations, and follow installation guide to re-install).
Taking all this into consideration and having discussions with our system administrators we may have the following options:
Option A (seams the closest to the customer support recommendation but requires the most efforts to built everything from scratch):
Option B (seams efficient, but we have never used SAPinst to copy Java systems before):
Option C (seams the easiest, but we have never done it for a Java/Netweaver/Sourcing system and found no SAP Sourcing documentation to follow):
Please provide your recommendation or ideas on this. What should we do? Anyone has more specific procedure to copy PROD to QA including Netweaver and sourcing software and database?
Thank You,
Michel Laberge
Senior application consultant SAP MM/Sourcing.
Request clarification before answering.
Hi Michel, Unless you get some support from Oracle on fixing the Oracle corruption, I think moving to rebuild QA using a copy of production makes sense I'm not familiar with options B and C but have heard of customers using option B. This isnt something we have tried or can provide documentation for. We can however provide some help on option A as it does as you say resemble what we suggest in the SAP note and other SCN entries. If I'm not mistaken there should be a recorded session on DB copy / migration topic. You may find this useful.
Regards,
Gary
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Gary, Thank you for your answer. I understand Option A is proven to work. I would still like to consider Option B since you wrote that it may have been used for this by some customers. Could you add the link to the “recorded session on DB copy / migration topic” you mentioned? I searched for it but could not find it.
Also, it would be much appreciated if you could mention this discussion to a colleague you may know in BC-INS component who may provide some guidance in regard of tool SAPinst to copy Netweaver Java server from PROD to QA with the specifics of our environment (UNIX/Netweaver/Java stack/Oracle/Sourcing).
Thank you,
Michel
Hi Michel,
Were you able to get the copy done?
I am faced with similar questions:
PRE-PROD CLM system connects to ERPCLNT100 and has materials, vendors and contracts loaded (and published to ERPCLNT100)
Can this be copied back to QA CLM system which connects to ERPCLNT200 and have the materials, vendors, contracts and links to outline agreements all converted for the QA client now?
Regards,
Subhasini
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.