on 2019 Aug 01 2:22 PM
We are upgrading from 5.0 to 7.0 - Classic scenario
Issue: Shopping cart is created and approved. As a result, a Purchase requisition as follow-on document is created in ECC. I can verify the status of the PR and can convert into the PO successfully. However, the SRM shopping cart item stays in status as - 'Error in transfer'. Is there anything we are missing
BBP_PD - shows status I1111 - Item in Transfer Process
Batch jobs for both BBP_GET_STATUS_2 and Clen_reqreq_up are working fine. We do not have PI, its direct RFC connectivity between ECC and SRM
Request clarification before answering.
Dear Sandeep,
Please check and implement the following Note:
2494346 - BBP_GET_STATUS_2 infinite loop while processing of
unchanged SCs
In addition, you can try to run the report: BBP_SC_AUTO_RETRANSFER as detailed in:
2154727 - How to trigger and debug SRM shopping cart transfer and RFC calls
I hope this helps.
Best Regards,
Tamás
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sandeep,
Based on the SAP Knowledge Base Article 2300120 - How to process shopping carts that were not transferred, https://launchpad.support.sap.com/#/notes/2300120 the Report BBP_SC_AUTO_RETRANSFER has to be scheduled as a background job in a regular basis in order to avoid inconsistent status.
Can you please check it once?
FYI. Also there is a known issue corrected by the SAP Note 2225147-SC limit subitem stays in status: Item in Transfer Process. If it corresponds to your case, you could implement and test the same.
Best regards,
Imre