Hello Experts,
We are facing a problem in CLM, we made an initial load of contracts in ECC, in our solution design there are some contracts that needs to be in CLM, so we have some of this contracts loaded in CLM, we maintain the same ID in both systems.
The problem arrives when we make some changes to the contract adding new line items in CLM. when we replicate this to ECC is not overwriting the line items that are already loaded.
in ECC we have a contract with one line item, position 10, then we upload the same contract in CLM with position 1. When we add a new line item in CLM position 2 and replicate this change to ECC, it's not updating/overwriting position 10 (1 for CLM) with the changes we made in CLM, it adds it as a new position. So now, instead of 2 positions I have three, the original 10, the CLM-edited 10, and the new position 20 (2 on CLM).
I really appreciate your comments
thanks
Request clarification before answering.
I tried, adding the same ID from ECC to CLM, to have 10 and 20 position in both systems, and after replicate it I got the following error message from ECC
Maintain services or limits (function not possible)
Someone knows if I need to change some configuration in ECC to allow the change of the line items in the contract.
Thanks for your helps