cancel
Showing results for 
Search instead for 
Did you mean: 

Process to integrate Ariba over existing Ariba CIG for ECC to S4HANA Conversion?

shashank_naik
Explorer
0 Kudos
554

There is an existing connection from Ariba to ECC over Ariba CIG. There is a planned ECC to S4HANA conversion. That means the backend system is changing.

The requirement is to continue to use Ariba CIG for Ariba integration.

However, what could be the process/steps on Ariba and Ariba CIG side to be followed to setup / repoint the connection to S4HANA?

Accepted Solutions (0)

Answers (0)