on 2013 Aug 29 8:12 AM
Hi,
We are using SRM7.02 ,
1. steps to perform org structure replicaiton from ECC to SRM ?
2. how and where to define number range for objects created in SRM i:e, BP,CP..... etc
3. what are the inputs necessary during replication using report : RHALENI ( tcode: PA30) for insert and update ?
4. how to sync the data from ECC to SRM and SRM to ECC, is 2 way possible ?
please throw some light on this
Regards
Kumar
Request clarification before answering.
Hi,
You should also refer SAP Note 312090 & following link:
http://scn.sap.com/thread/3149748
I hope it helps.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kumar,
If you would like to replicate HR data to SRM, please do the neceaary settings according to note
550055.
It is not possible to replicate data from SRM to HR. This is not a two-way function.
Best regards,
Ivy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.