cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Need to change UOM in ECC in PO which is created in SRM

Former Member
0 Likes
181

Hi Guys,

The requirement is to convert u201C u201D unit of measure in to EA for limit purchase orders in the ECC for u201CECPOu201D document types. The PO's are created in SRM (backend system).Can any one advice me how can i achive this ECC.

Is this can be achevied techincally or functionaly .Kindly guide me .

Kind regards,

SAB

View Entire Topic
Former Member
0 Likes

No.cancel the PO and create a new PO.

it is not possible to change UOM.

Why requester forgot to put correct UOM or any difference between Contract UOM and Material Master Order UOM.

Why do you want to change? Any accident happen in your system for single instances which system supposed to do correct but failed.

Muthu