on ‎2015 Feb 25 11:30 AM
Hello all,
We are facing some issues regarding good receipt sending status valiadations from ERP to SUS (MM-SUS scenario), as we aren't able to find an interface that allow us to know, at ERP side, if the confirmation were successfully generated at SUS side. Do you know how can we obtain this information?
Moreover, if a good receipt is successfully sent from ERP, but fails to enter in SUS, how can we be able to resend the document?
Thanks in advance.
Best regards,
João Salgado
Request clarification before answering.
Hi Salgado,
Sorry for the late response, been a bit occupied.
The program RPODDELVRY is the one you are looking for. Most times this is successfully executed when scheduled, but the generated IDoc fails mostly in the connecting XI system.
You have to identify and re-trigger this IDoc.
Hope this helps.
Regards,
Archit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi João Salgado,
Yes positively possible. Please use transaction WE02 in your MM system and fill in the selection screen to the time when RPODDELVRY program is scheduled in your system.
Please refer for further assitance.
To re-trigger IDocs please use t-code BD87.
Pardon my late response.
Regards,
Archit
Dear Archit,
Thanks for your feedback.
Unfortunately, by transaction WE02 we weren't able to find that information.
We created a test scenario where the good receipt is sent successfully from ERP, but generates error in SUS.
Analysing WE02 in ERP side the iDoc has Status OK, so it doesn't give us the information of the full process, but only information about the process on ERP side.
Best regards,
João Salgado
Hi João Salgado,
In ECC where you have seen that the IDoc has been successfully sent, in WE02; Please follow this
>
Go to Control Records-->Partner tab-->Recipient information
check Port here, that is your XI/PI system.
Check sm58 in your XI/PI system.
Using the help of you XI consultant you should be able to debug this. You could also check smq1 for the outbound message queue. Maybe some message is stuck in the queue, clearing which your issue may be resolved.
Thanks,
Archit
Dear Archit,
First of all big thanks for your help.
Maybe I wasn't clear enough in my previous posts, but the solution you propose doesn't fit in our requirements.
In our case, we need to know in ERP side (just conferencing data in ERP) if the material document entered successfully in SUS.
For example, if the material document was successfully sent from ERP, but fails to enter in SUS, the information in ERP is that the sending status is success, but in fact the material document didn't enter in SUS. In this situations, we intend to have the information in ERP side that the document replication wasn't successfully processed
Is this possible? If yes, how can we proceed?
Thanks in advance.
Best regards,
João Salgado
Dear Archit,
Thanks for your feedback.
We have checked the mentioned BADI, which is already used by us to control the purchasing document sending to SUS, and we don't understand how can it be applied to help us in material document replication status problem.
Can you provide us more information?
Thanks in advance.
Best regards,
João Salgado
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You may go through the note: 1729284 - Error in SUS while transferring goods receipt details from ECC which may give some idea.
Regards,
APKT
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.