on 2018 Jan 12 11:38 AM
Hello Gurus..
I'm trying to replicate material master form ECC to SRM .My business scenario is one SRM System 2 backends. Backend 1 is already up & running . Now configuring backend 2
After going through all the posts & blogs on this topic I have done all the steps as below
RFC connections were already created by BASIS team , they are working fine
Definition of backend systems
R/3 backend and EBP backend defined
Define Replication Site for EBP systems
CRM site defined with own RFC dest in the site attributes
R3 site defined with R3 RFC dest in the site attributes
Maintain Middleware Parameters
Table SMOFPARSFA populated with key MCRM, par name MCRM_CONSUMER, User CRM and param value 'X'
Deactivate CRM Specific Settings
Ran program BBP_PRODUCT_SETTINGS_MW
Set Up CRM Parameters in R/3
CRMCONSUM table entry for CRM
CRMRFCPAR table entry for EBP backend cliet maintained as per standard
CRMPAROLTP table already populated as standard
I'm getting DNL_CUST_BASIS3 & DNL_CUCT_PROD0 as running I have checked teh SMQ2 & SMQ1 queues in SRM no issue here.. however there is no entry in ECC system SMQ1.. I am not able to understand what is wrong.. I have gone through all the notes related to this section & maintained the settings .. I m still facing this issue request you to please help me out.
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
The Material replication has been done however i faced other issues which i mentioned in
https://answers.sap.com/questions/406808/matarial-replication-issue.html so closing this question.
Thanks .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Moacir Goelzer,
I rescheduled all the objects today after checking the RFC connectity middleware parameters and all.. today i can see DNL_CUST_PROD0 &DNL_CUST_PROD01 are green in r3am1.. however when i try to load "Material" & DNL_CUST_BASIS3 they are still running.. but this time i have below errors In SMW01
i have read & checked the tables t023 in ECC & Comm_category in SRM as mentioned in https://archive.sap.com/discussions/thread/3202271, they both do not consist any entry for 0702 mat group..
& in smq2 I'm facing issue as below
I am not able to understand how to track this error.
Do you have any suggestions on this ??any input is appreciated ...
Thanks in advance
Best Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Moacir Goelzer,
Thanks for your reply .. i have tried to open the note 1553940 on browser it did not open , i tried to check in SNote i got the message as below
I have read a lot of posts & maintained the middleware settings as recommended in "http://searchsap.techtarget.com/tip/How-to-replicate-a-material-master-from-R-3-to-SRM" & in note 720819
However , i m still getting the result as below
i have checked SMQ1 & SMQ2 in ECC & SRM there were no entries . I am attempting this for first time & i don't know if its the right approach to replicate material master from 2 separate backends to one SRM system .
please let know if i am doing something wrong .
Thanks in advance for your time & effort .
best regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Madhavi Velamuri,
I am Moacir Goelzer and I will assist you in this query.
I've found this SAP note 1553940 to you read and take a look in the configuration is set correctly on the backend side.
If the configuration is correctly, can you attached here the screen shot of the tables of your backened where the DNL_CUST_BASIS3 & DNL_CUCT_PROD0 as running?
Thank you.
Kind Regards,
Moacir Goelzer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Moacir Goelzer,
Thanks for your reply ,
I tried to open the note 1553940 but was unable to open in browser, i tried to download it in SNote , i got the below message
please note that i maintained all setting as per note 720819 & as mentioned in site
"http://searchsap.techtarget.com/tip/How-to-replicate-a-material-master-from-R-3-to-SRM ", i have read a lot of posts & tried to maintain & check & schedule the initial load after each setting , i'm still getting result as below
I'm doing this for first time & i don't know if this is the right way to do material master replication from 2 separate ECC systems into one SRM client (Classic scenario).
I have checked SMQ1 in ECC & SMQ2 in SRM , there is no entry for this . Please let me know how else I can check .
Thanks in advance for your time & effort .
Best Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.