on 2016 Mar 14 10:50 AM
Hi Experts,
is there a way to automatically replicate materials in SRM immediately after they have created purchasing views in ECC?
Customer loads materials to ECC in batches and currently I run r3as manually after to do replication (initial loading).
Is there a way to trigger this automatically?
Hoping for your help,
Regards,
Dex
Request clarification before answering.
Hi Dex,
I this case the tables CRMCONSUM, CRMRFCPAR, CRMSUBTAB and CRMPAROLTP must be set correctly on ECC side through the SAP note 720819. In the case of the intial load on R3AS the object MATERIAL must be load and the table CRMRFCPAR must be set correctly to download type 'I'.
So, kindly read the note and make sure these tables are correctly set. After this I believe the initial download will be replicate automatically to SRM.
Kind Regards,
Moacir Goelzer
SRM Support Engineer MS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI dex
Generally if you have all the settings maintained should start on its own
Also refer the note it lists down all the steps if these are done the delta load ideally flows on its own
Also check report BBP_PRODUCT_SETTINGS_MW
BTE event has been maintained in R/3 table TBE31 this one is mainly responsible for automatic transfer
720819 - Middleware consumer entry for SRM in OLTP system
regards
Vinita
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Dex,
You should maintain entry in table CRMRFCPAR for delta download, refer SAP Note 720819 for further details.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.