on 2017 Aug 11 3:24 PM
Hi,
We are facing issue with PR transfer to SRM. The PR is created with material group and when it is transferred to SRM then it fails with SRM log as: "Specify a valid contract"
The PR transfer logic should not check for contract as we dont have any contract in SRM created with only material group (we have contract with material numbers).
Please suggest.
Note: this is happening for only one material group and we are on SRM 7 EHP3
Thank You.
Regards,
Abhishek
Hi,
Would you please check if there is any backend contract assigned to such PR?
BR,
Ivy