Issue with PO Response in SRM 7.0

Former Member
0 Likes
138

Hi Experts,

We have upgraded our system from SRM 4.0 to 7.0. Post upgrade we are facing an issue with PO Response document.

Scenario:

When the PO is ordred, Vendor sends a the PO response through XML. Our middleware call the an FM which uses BBP_PD_POC_CREATE to create the PO response(BUS2209) with acceptance status.

Problem:

The status of the PO response is always + In Process+. But in SRM 4,0 we are having the responce with accepted status.

Could you please throw somw light on this.

Thanks in Advance,

Vishnu Reddy

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

There is this note that might help you.

Note 1393346 - PCO:Header status is open, even all items in PCO accepted

Although a relatively new note, this note is only relevant for SRM5.0 at the moment. What I'd suggest you do is to (temporarily) modify the standard code (in your development or test system) based on the correction instruction of this note. If it resolves your problem, create an OSS mesasge to SAP and ask them to upport the note to SRM7.0. Then you could reverse your modification back to standard and apply the note officially.

Answers (0)